REQUIREMENTS
ALIPORE HOSPITAL EXPANSION PROJECT
HOME
ALIPORE HOSPITAL PROJECT
Requirements of Equipment, Machineries and Furnitures at the Alipore Hospital and its Estimated Cost
All are requested to contribute towards the need of these items and help serve the patients in best possible standards.
URGENT REQUIREMENTS

No

DESCRIPTION OF THE REQUIRED EQUIPMENT, FURNITURE  AND MACHINERIES 

No. Required

RATE

TOTAL ESTIMATED COST (Rs.)
in Indian Rupees

TOTAL ESTIMATED COST (£)
in Sterling Pounds

1 Endoscope with Accessories 1 1,100,000 1,100,000 13,095
2 Foetal Monitor for Gynaecology Department, For High Risk Pregnancy Monitoring 1 ----------- 125,000 1,488
3 Ventillator (Requirement  to Develop Cardiology Department, ICCU & Operation Theatre) 2 800,000 1,600,000 19,048
4 Cardiac Monitor with Multi-Parameters for I.C.C.U. / O.T. (Graphic ECG, BP, NIBP, SPO2, Respiratory (2 Urgently Reuired) 3 200,000 600,000 7,143
5 Computerised Auto Refrectometer (Ophthalmic Dept.) 1 350,000 350,000 4,167
6 Ambulance Small Van with Emergency Accessories 1 400,000 400,000 4,762
7 Ultrasound Sonography Scanner Machine (USG) 1 700,000 700,000 8,333
8 Accessories for Casualty, Operation Theatres and ICCU ---- ----------- 150,000 1,786
9 Pulse Oxymeter 2 41,000 82,000 976
10 Upgradation of X-Ray Machine Generator ---- ----------- 275,000 3,274
11 Hospital Management Computer Software Package (with records for OPD, In-Patient, Store, Billing, Laboratory, Radiology, Ultra Sound Sonology, Server, LAN Modules and Computers)  ---- ----------- 230,000 2738
12 Laboratory Equipment ---- ----------- 205,000 2,440
13 Endo-Urology Gazettes and ELSW Lithotripter ---- ------- 1,500,000 17,857
14 Washing Machines {for (i) Linen, (ii) Surgical Clothes & (iii) Patients Clothes} 3 25,000 75,000 893
15 Boyles Trolley for Operation Theatre 1 80,000 80,000 952
16 Operation Theatre Light 1 200,000 200,000 2,381
17 Air Conditioners 4 30,000 120,000 1,429
18 Refrigerators 3 25,000 75,000 893
19 Fowler Beds with Accessories (for the 3rd Floor Project) 30 15,000 450,000 5,357
20 Furniture (for the 3rd Floor  Project) ---- ----------- 350,000 4,167
21 Computers 6 30,000 180,000 2,143
Estimated Total of Requirement #

###

8,847,000 105,321
REQUIREMENTS
ALIPORE HOSPITAL EXPANSION PROJECT
HOME